Location: Sint Gillis Waas

Year: 2024

For All Import, importer and distributor of tiles, we built a new warehouse of over 700 m² in Sint-Gillis-Waas, complementing existing operations and giving the company room to grow.

With an eaves height of 8 metres, the warehouse offers generous storage capacity. A recessed loading dock allows fast and safe loading and unloading of trucks, essential for a business handling heavy pallets every day.

The design was developed with architect Kitty Strybol. Vulsteke Industrial Buildings handled the engineering, steel construction and full execution.

Project details

  • Location: Sint-Gillis-Waas (East Flanders, Belgium)
  • Client: All Import, tiles
  • Architect: Kitty Strybol
  • Type: warehouse with loading dock
  • Floor area: over 700 m²
  • Height: 8-metre eaves

Share this page: