Location: Hooglede

Year: 2024

We developed a steel structure, finished aesthetically with concrete plinths and sandwich panels. The vaults and large spans (up to 45 metres with just one intermediate column) guarantee maximum flexibility and freedom of movement in the production hall. Large glazed sections were incorporated along the long side to bring in plenty of daylight. The high-quality interior finish of the offices and the climate control in the halls contribute to well-being at work.

Share this page: