Harry Malter

Location: Destelbergen

Year: 2024

For Harry Malter Family Park in Destelbergen we built a new entrance building. It replaces the former reception building and now forms the welcoming gateway to the park, open to families with children all year round.

The main building of around 650 m² and a smaller annex were built in steel, to a design by Parallel Architecten (Wetteren). A leisure building has its own requirements: open, spacious interiors, plenty of daylight and smooth visitor flow. The steel structure is also designed to carry solar panels.

From sports centres and shooting ranges to family parks: Vulsteke Industrial Buildings also delivers special-purpose buildings on a turnkey basis, with an in-house engineering office and one point of contact from design to handover.

Project details

  • Location: Bosheidestraat, Destelbergen (East Flanders, Belgium)
  • Client: Harry Malter Family Park
  • Architect: Parallel Architecten
  • Type: entrance building for a family park
  • Floor area: around 650 m² plus annex
  • Sustainability: steel structure ready for solar panels

Share this page: