Location: Le Havre

Year: 2019

2 storage halls with a total surface area of 17,500 m².
First hall 120mL x 48,6mW x 15mH with 10 loading bays.
Second hall 120mL x 97,2mW x 15mH with 20 loading docks.

The project was carried out with a tight schedule: 6 months between the start of the works and the delivery.

Share this page: